Solar-powered EV charging and battery installation in Uganda

E-Mobility

Charging Infrastructure, Solar-Powered

We equip EV charging stations with solar power and battery storage, and install chargers for institutions and development partners. Charging infrastructure only. We do not sell or operate vehicles.

0+

Charging projects

0

Development partners

0

Years in East Africa

0%

Solar-integrated

Why e-mobility

Charging that runs off the sun, not the peak tariff.

We connect EV chargers to a dedicated solar and battery system rather than drawing raw power off the grid, so charging does not add new peak demand to your site. Every project starts with a feasibility study, then we size the system around your fleet and fold charging into the same energy management system that runs the rest of your installation. We build the infrastructure, not the vehicles.

Solar + battery

Behind every charger

Feasibility first

Every project

One EMS

Charging folded in

Institutional

Fleet-scale focus

What we cover

Four parts of a charging project.

Solar · battery · charger

Charging Station: Solar & Battery Integration

Chargers fed from a dedicated solar and battery system, so charging never adds new peak demand to your site.

Solar-integrated EV charging installation in Uganda

We connect EV chargers to a dedicated solar and battery system rather than drawing raw power off the grid, so charging doesn't add new peak demand to your site. Sized around your fleet's charging schedule and vehicle count. Commissioned for GIZ's Nissan Ariya charger at their Nakasero country office in 2023.

  • No new peak demand on your site
  • Sized to fleet and schedule
  • Proven on the GIZ Nissan Ariya charger

Dedicated

Solar + battery

Fleet-sized

To vehicle count

No peak add

To site demand

2023

GIZ Ariya charger

Fleet · site · sizing

Feasibility Studies

Before any charger goes in, we assess fleet size, charging patterns and available solar space, and hand you a sized system and cost model.

EV charging feasibility assessment workshop in Uganda

Before any charger goes in, we assess your fleet size, charging patterns and available roof or ground space for solar. The output is a sized system and a cost model, the same approach used for the Embassy of the Kingdom of the Netherlands' EV charging feasibility study. Suited to institutions planning a fleet transition rather than a single charger.

  • Fleet and charging-pattern assessment
  • Sized system and cost model output
  • Built for fleet transitions, not one charger

Fleet

Assessed first

Sized

System output

Cost model

Included

Embassy NL

Reference study

EMS · scheduling

Energy Management System Integration

Charging load folded into the same EMS as the rest of your installation, so generation, storage and vehicles run as one system.

Energy management dashboard integrating EV charging in Uganda

Charging load gets folded into the same energy management system that runs the rest of your solar and battery installation, so generation, storage and vehicle charging are managed as one system rather than three. Charging can be scheduled around solar production to minimise grid draw. Built on the same EMS platform used across our O&M-monitored sites.

  • Generation, storage and charging as one system
  • Charging scheduled around solar
  • Same EMS as our monitored sites

One system

Not three

Scheduled

Around solar

Min grid

Draw

Shared EMS

With O&M sites

Embassies · agencies · public

Institutional & Development Cooperation Projects

Charging infrastructure for embassies, agencies and public institutions, with procurement and reporting built to donor requirements.

Institutional EV charging infrastructure project in Uganda

We work with embassies, development agencies and public institutions on charging infrastructure tied to their own fleet or public-access programmes, not private vehicle owners. Yujo Charging Hub and the Africrooze charging station in Bugiri (under construction) are both institutional-scale projects in this category. Procurement and reporting structured to match donor and government requirements.

  • Embassy, agency and public clients
  • Donor-grade procurement and reporting
  • Institutional-scale, not private owners

Institutional

Scale

Donor-grade

Reporting

Yujo

Charging hub

Africrooze

Bugiri, in build

Explore other business units:

View all business units →